PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Interior metal framing at the 2nd floor Facing South.jpg Interior metal framing at the UCIA 2nd floor Facing South.jpg Laying our block around the UCIA roof.jpg 4th floor duct work delivery Facing East.jpg Erecting the stone panels at the East Elevation 7.jpg Installed ductwork hangers at the 4th floor Facing  North.jpg Installed ductwork hangers at the 4th floor Facing  West.jpg Installed sprinkler heads at the 1st floor Facing West.jpg Installed sprinkler main raiser at the 2nd floor Facing West.jpg
Previous pageNext page Erecting the stone panels at the East Elevation 7
Erecting the stone panels at the East Elevation 7